Cluxn

Quality & Production Systems

Catch defects before they leave the floor.

QC automation, defect tracking, and traceability that big buyers now mandate before they'll place an order.

Quality & Production SystemsLive
Batch #4471Passed
Batch #4472Passed
Batch #4473Passed
Audit trailLogged

The Problem

Quality holds get communicated by message, and jobs slip past them.

Quality Escapes

0%

of output lost to rework

Quality holds get communicated by WhatsApp message, and jobs slip past them.

Traceability Gaps

+0%

higher recall cost without it

Batch traceability is tracked on paper, taking hours to reconstruct during an audit.

Traceability Gaps

+0%

higher recall cost without it

Buyers now ask for documented QC and traceability before they'll place an order — and you can't produce it fast.

What's included

What's included.

QC Flag System

Holds trigger before a job advances.

Defect Tracking

Every defect logged, categorised, and traceable.

Batch Traceability

Full history reconstructed in minutes, not hours.

Audit-Ready Reporting

Documentation ready before a buyer asks.

Vs. Alternatives

Why not just use what everyone else uses?

Tribal Knowledge

Undocumented processes that vary by whoever happens to be on shift.

Generic Consultants

Broad frameworks and templates that don't reflect your actual shop floor.

Cluxn

SOPs and systems built directly from your floor, rolled out in 6–10 weeks.

Process

The timeline.

Weeks 1–2

Quality Process Audit

Map current QC steps and where things slip

Weeks 3–6

System Design

Flag rules and traceability matched to buyer expectations

Weeks 7–9

Build & Integrate

Flags fire at the point of work
Not after

Week 10

Rollout & Train

QC and floor teams trained
Phased by line

See It In Context

See Quality & Production Systems in context.

See Quality & Production Systems in context.Live
Batch #4471Passed
Batch #4472Passed
Batch #4473Passed
Audit trailLogged

Proof

The result in practice.

Steel Fabrication & Metalwork

0

from 12/month

QC hold notifications sent via WhatsApp — 2–3 jobs per week advanced past a hold flag before the message was seen.

Meridian Fabricators

FAQ

Common questions.

Not always — most QC flag and traceability systems run on software connected to your existing production process; specific cases (e.g. barcode/RFID) add hardware as needed.

A typical QC and traceability system rollout takes 6–10 weeks, phased by production line.

The system is designed around what large buyers typically ask for — documented QC steps, defect logs, and reconstructable batch history.

Every engagement is scoped individually — production line count and integration complexity both affect cost. During your free assessment, we give you an exact number within 48 hours, not a guess.

Ready to fix it?

One problem. Scoped in 4 weeks.

No pitch, no generic demo — a plan built around what's actually slowing you down.

Book a 30-Minute Call ↗

30 minutes, straight to the fix. No sales script.