Guides

Resources built
for manufacturers.

Checklists, frameworks, and guides to help you make better technology decisions — without the sales pitch.

The Leak Assessment: 30 minutes, and a written plan within 48 hours, whether or not you hire us.

Our guarantee
  • Monthly plans: Your first fix goes live on the date in your written plan, or the extra hours are on us.

Included

  • Fixed price in writing
  • Written plan in 48 h
  • No setup fee
  • You own everything
Filter by:
Three phone outlines side by side — two showing dense unreadable text, the third a clean structured specification table

Free Resource

How Your Buyer Compares You

Your buyer does not read your website. They open three suppliers at once, on a phone, and spend about ten minutes deciding who to ring. 81% of manufacturing buyers already have a shortlist before they contact a vendor — and most manufacturer websites make comparison impossible. This is the test they run, written as a scorecard. Score yourself, then score two competitors. It takes half an hour and it is uncomfortable.

Download Free →
A spreadsheet grid with plausible manufacturing process rows and one enlarged, masked annual-total cell

Free Resource

What Manual Work Actually Costs

Everyone knows the shift report takes too long. Nobody knows what it costs per year. That gap is why automation proposals get postponed — not because the case is weak, but because nobody has done the arithmetic. This is the arithmetic, as a spreadsheet you can open and change. Eleven manufacturing processes, pre-loaded with realistic defaults, so you get a number in ten minutes and can argue with it afterwards.

Download Free →
A contract page shown as ruled lines with nine highlighted and numbered, and one struck through in red

Free Resource

What Happens If They Walk Away

One of our clients came to us with an ERP that was forty per cent configured. The consultant had left mid-project. They owned a licence, a half-built system, and no way to get either finished. That outcome is usually decided months earlier, in a contract nobody read closely. These are the nine clauses that determine whether a stalled project is a delay or a total loss — written so you can raise them without a lawyer in the room.

Download Free →
A dashboard-style panel of twelve bars turning from green to red, illustrating a software project deteriorating

Free Resource

12 Signals a Software Project Is About to Fail

Seventy-three per cent of manufacturing ERP projects fail to meet their objectives, and the average cost overrun is 215%. Almost none of those failures were invisible at the time. The signals were there in the first month, and nobody knew what they were looking at. This is the list. Twelve things you can observe from outside the project, what each one actually means, and what to do about it this week.

Download Free →

Step 1 of The Leak-First Method

Tell us what slows your plant down.

We will show you the first fix and what it costs. No pitch.

The Leak Assessment: 30 minutes, and a written plan within 48 hours, whether or not you hire us.

01

Find the leak

30-minute Leak Assessment

02

Get the plan

Tasks and a fixed price in writing within 48 hours

03

Fix it first

First working version in about 4 weeks

04

Train and hand over

Your team trained; code, docs and logins are yours

05

Next leak

Support, or the next fix on a monthly plan

Every project includes

  • 30-minute Leak Assessment
  • Written plan within 48 hours
  • Fixed scope and price in writing
  • Weekly demos
  • Your team trained before go-live
  • Code, documents and logins handed over
  • Support after go-live
  • Written exit clause, no license fees