Quality & Production Systems
Traceability that big buyers now require before they'll order.
30 minutes. You leave with a written plan, whether or not you hire us.
The Problem
8% — of output lost to rework.
of output lost to rework
8%
+70% — higher recall cost without it.
higher recall cost without it
+70%
4 hrs — response window before win rate drops.
response window before win rate drops
4 hrs
of output lost to rework
8%
Included
quality Flag System
Holds trigger before a job advances.
Defect Tracking
Every defect logged, categorised, and traceable.
Batch Traceability
Full history reconstructed in minutes, not hours.
Audit-Ready Reporting
Documentation ready before a buyer asks.
Tech Stack
Vs. Alternatives
Tribal Knowledge Undocumented processes that vary by whoever happens to be on shift. | Generic Consultants Broad frameworks and templates that don't reflect your actual shop floor. | Cluxn RecommendedWritten work instructions and systems built directly from your floor, rolled out in 6–10 weeks. | |
|---|---|---|---|
| Built for your operation | |||
| Support after go-live | |||
| Fixed, predictable timeline | |||
| No lock-in — you keep ownership |
Process
01
Weeks 1–2
02
Weeks 3–6
03
Weeks 7–9
04
Week 10
Questions
Not always — most quality flag and traceability systems run on software connected to your existing production process; specific cases (e.g. barcode/RFID) add hardware as needed.
Next step
We will show you the first fix and what it costs. No pitch.
30 minutes. You leave with a written plan, whether or not you hire us.
We listen
You tell us where time or money leaks. 30 minutes, your words.
We map it
We show which fix comes first and what it should cost.
You get a plan
A written plan in 48 hours. Keep it, even if you never hire us.