Cluxn

AGING INFRASTRUCTURE

IT Infrastructure Consulting for Manufacturing Companies

Audit, stabilise, and modernise your servers, networks, and on-prem systems.

Book Free Assessment

Lifecycle Mapping

Every server and network component documented with end-of-life dates. Replacements planned, not reactive.

Failover Architecture

Single points of failure identified and eliminated. Production continues if one system goes down.

Tested Recovery

Backup and recovery process tested quarterly. Recovery time measured and rehearsed before a crisis.

Runbook Handover

Full operational documentation for your in-house team. No dependency on the consultant for routine operations.

What This Replaces

Before. After.

Before Cluxn

  • Server hardware running on expired support contracts
  • Network outage causes full production halt with no fallback
  • Backup and recovery process never tested — status unknown
  • IT decisions made reactively, after failures have already occurred

After Cluxn

  • Infrastructure lifecycle mapped, replacement planned before failure
  • Network segmented — single point of failure eliminated
  • Backup tested quarterly, recovery time documented and rehearsed
  • Infrastructure roadmap aligned to production growth timeline

By The Numbers

Unplanned downtime events

Before
4/yr
After
0

Recovery time (hrs)

Before
28hrs
After
2hrs

Systems on expired support

Before
70%
After
0

Why Cluxn

The third option.

01

Manufacturing-Only Context

We don't take on generic IT projects. Every engagement is in a production environment — which means we've already seen your problem before we start.

02

Outcome-Measured Delivery

We define measurable success criteria before we build. You have a number to hold us to — not just a feature list delivered and declared done.

03

No Rip-and-Replace

We integrate with what you already have. The right tool for your scale, connected to your existing stack — no new system justified by the sale.

04

Accountable After Go-Live

The engagement doesn't end at launch. We stay on to monitor adoption, fix edge cases, and ensure the solution actually gets used on the floor.

Performance

Results that hold up.

3 days

Avg downtime per failure

Unplanned production stop

28 hrs → 0

Downtime events

Over 18 months

99.97%

Uptime achieved

Post-modernisation

12 months

Infrastructure roadmap

Replace before failure

0

Single points of failure

After network segmentation

Quarterly

Backup tested

Recovery time documented

Case Studies

The result in practice.

0 in 18 months

from 28 hrs

{Industrial Hardware Manufacturing}

On-premise server ran accounting, ERP, and shop floor data — one hardware failure caused 28 hours of unplanned production downtime

SRJ Heat Plates & Gaskets

resolved

from 14 open

{Steel Fabrication & Metalwork}

Infrastructure audit found 4 of 6 servers running past end-of-support — no patches applied in 14 months, no documented recovery process

90 min

from 11 hrs

{Auto Components Manufacturing}

Network failure during peak production run caused 11-hour unplanned downtime — no redundancy, no documented recovery process existed

Client Results

What manufacturers say.

TH

Our field sales team was submitting handwritten order forms at the end of the day. Order entry was delayed 12–18 hours after the customer visit. Cluxn built a mobile order entry app with offline capability. Field orders are entered at the customer's premises and synced immediately. Our dispatch team sees orders the same day they are taken.

R

Rohit Joshi

National Sales Head, ToolMaster Hardware

Tools & Hardware

Verified client

AM

We had a server that had not been backed up properly in 9 months. We found out when a hard drive failed. We lost a month of data. Cluxn audited our entire infrastructure and implemented a proper backup and recovery system. Nothing has been lost since.

G

Girish Mehta

Managing Director, AutoPress Manufacturing

Auto Components & Parts

Verified client

PA

Our B2B buyers were calling sales for pricing, emailing for specs, then calling again to place orders. A simple reorder could take 3 days. Cluxn built a dealer portal where they see live pricing, download specs, and place orders in one session. Average order processing time dropped from 3 days to 20 minutes.

P

Praveen Menon

Sales Director, PrecisionParts Auto

Auto Components & Parts

Verified client

MI

We had data in our ERP but nobody used it for decisions. Reports took an hour to run and were always out of date by the time they printed. Cluxn built a live dashboard. Now the production floor, stores, and management all see the same numbers in real time.

A

Ashok Sharma

Managing Director, MetalArc Industries

Metal Fabrication & Job Shops

Verified client

FC

Our previous ERP implementation failed — the consultant left mid-project and the system was only 40 percent configured. Cluxn assessed what was salvageable, migrated the data properly, and configured the remaining modules in 10 weeks. We have been live for 6 months with zero unresolved issues.

R

Rajan Mehta

Managing Director, ForgeAxis Components

Industrial Equipment & Machinery

Verified client

AP

Our costing was done manually in Excel, pulling data from four different places. Quotes took 3–4 days. Cluxn built a costing engine that pulls live rates and calculates in minutes. We are winning jobs we used to miss because our response was too slow.

R

Rajesh Menon

Managing Director, Apex Precision Castings

Industrial Equipment & Machinery

Verified client

AC

Our purchase order approval process had four people in an email chain. An urgent PO could take 3 days to get approved. Cluxn automated the approval workflow with escalation rules. Urgent POs now approve in under 2 hours.

S

Suresh Pillai

Finance Head, AutoPress Components

Auto Components & Parts

Verified client

HM

We used to get 2–3 RFQs a month through referrals. The new site ranks for our product category and we now receive 15–20 qualified RFQs every month. Two of our largest current customers found us through Google.

R

Rajesh Mehta

Managing Director, Hartwell Metal Works

Metal Fabrication & Job Shops

Verified client

TH

Our field sales team was submitting handwritten order forms at the end of the day. Order entry was delayed 12–18 hours after the customer visit. Cluxn built a mobile order entry app with offline capability. Field orders are entered at the customer's premises and synced immediately. Our dispatch team sees orders the same day they are taken.

R

Rohit Joshi

National Sales Head, ToolMaster Hardware

Tools & Hardware

Verified client

AM

We had a server that had not been backed up properly in 9 months. We found out when a hard drive failed. We lost a month of data. Cluxn audited our entire infrastructure and implemented a proper backup and recovery system. Nothing has been lost since.

G

Girish Mehta

Managing Director, AutoPress Manufacturing

Auto Components & Parts

Verified client

PA

Our B2B buyers were calling sales for pricing, emailing for specs, then calling again to place orders. A simple reorder could take 3 days. Cluxn built a dealer portal where they see live pricing, download specs, and place orders in one session. Average order processing time dropped from 3 days to 20 minutes.

P

Praveen Menon

Sales Director, PrecisionParts Auto

Auto Components & Parts

Verified client

MI

We had data in our ERP but nobody used it for decisions. Reports took an hour to run and were always out of date by the time they printed. Cluxn built a live dashboard. Now the production floor, stores, and management all see the same numbers in real time.

A

Ashok Sharma

Managing Director, MetalArc Industries

Metal Fabrication & Job Shops

Verified client

FC

Our previous ERP implementation failed — the consultant left mid-project and the system was only 40 percent configured. Cluxn assessed what was salvageable, migrated the data properly, and configured the remaining modules in 10 weeks. We have been live for 6 months with zero unresolved issues.

R

Rajan Mehta

Managing Director, ForgeAxis Components

Industrial Equipment & Machinery

Verified client

AP

Our costing was done manually in Excel, pulling data from four different places. Quotes took 3–4 days. Cluxn built a costing engine that pulls live rates and calculates in minutes. We are winning jobs we used to miss because our response was too slow.

R

Rajesh Menon

Managing Director, Apex Precision Castings

Industrial Equipment & Machinery

Verified client

AC

Our purchase order approval process had four people in an email chain. An urgent PO could take 3 days to get approved. Cluxn automated the approval workflow with escalation rules. Urgent POs now approve in under 2 hours.

S

Suresh Pillai

Finance Head, AutoPress Components

Auto Components & Parts

Verified client

HM

We used to get 2–3 RFQs a month through referrals. The new site ranks for our product category and we now receive 15–20 qualified RFQs every month. Two of our largest current customers found us through Google.

R

Rajesh Mehta

Managing Director, Hartwell Metal Works

Metal Fabrication & Job Shops

Verified client

Technology Stack

Built on the right tools for manufacturing.

AI / Gen AI
Machine Learning
Computer Vision
Predictive Analytics
Digital Twin
IoT & Sensors

FAQ

Common questions.

Manufacturing operations depend on IT systems for production tracking, ERP, quality management, and communications. When aging infrastructure fails, production halts. An IT infrastructure audit identifies failure risks before they become 28-hour downtime events.

A manufacturing IT infrastructure audit documents every server, network switch, and connectivity dependency. It identifies end-of-life hardware, unpatched systems, single points of failure, and undocumented recovery processes — ranked by production impact if each were to fail tomorrow.

Unplanned downtime is prevented by addressing infrastructure risks before they become failures: replacing end-of-life servers before they fail, eliminating single points of failure in network architecture, testing backup and recovery processes quarterly rather than discovering they don't work during a crisis.

Not always. The decision depends on your production system dependencies, data sensitivity, and connectivity reliability at your plant location. Some systems belong on-premise; others benefit from cloud migration. The right answer is a 12-month infrastructure roadmap that sequences decisions by risk and impact.

Typically 6–12 months for a full modernisation programme, executed in stages to avoid single-event production risk. High-priority risks (end-of-life servers, no backup process) are addressed first, within weeks of the initial audit.

Exploring this as a business problem? See how we approach Disconnected Systems

Next Step

Pick one problem. We'll scope a solution in 4 weeks.

No pitches. No generic demos. Your specific manufacturing problem — our exact plan to fix it.

Book Free Assessment

What happens next: you answer 12 quick questions, we review them, and you get a Google Meet invite within 24 hours. One 30-minute call — you leave knowing the highest-ROI fix in your operation, whether you work with us or not.

How It Works

The process.

01

Infrastructure Audit

Document every server, switch, and connectivity dependency. Identify single points of failure and end-of-life components.

02

Risk Prioritisation

Rank risks by production impact. Sequence fixes by what would cause the most damage if it failed tomorrow.

03

Modernisation Plan

Build a 12-month infrastructure roadmap: what to replace, what to migrate to cloud, what to maintain and document.

04

Implementation & Handover

Execute in stages. No single-change-event failures. Full runbook documentation for your in-house team.